Automatic parts processing technology

Automatic parts processing technology

With the continuous updating of the times, our requirements for products are also higher and higher. We must require the products to meet the standards or appearance. Dongguan automatic parts processing is one of them. What are the technical requirements for automatic parts processing?

1: When installing the hydraulic system, it is allowed to use sealing filler or sealant, but should avoid entering the system.

2: The parts and components entering the installation can be installed only with the certificate of inspection part.

3: The unmarked shape service shall meet the requirements of gb1184-80, and the allowable error of unmarked length shall be ± 0. 5mm。

Dongguan automatic parts processing

4: For fasteners with regular tightening torque, it is necessary to select torque wrench and tighten according to regular tightening torque.

5: Before assembly, strictly check and remove the residual sharp angle, burr and foreign matters during the processing of parts. Ensure that the seal will not be scratched during installation.

6: It is necessary to clean and clean the parts before installation, and there shall be no burr, flash, oxide scale, rust, chip, oil stain, colorant and dust, etc.

7: After the bearing outer ring is installed, the end face of the bearing cover at the positioning end shall be evenly touched. There shall be no scratch, scratch and other defects on the surface of the parts.

About the author

chengcg administrator

    Leave a Reply